Functional requirements that need to be achieved for battery detection: Quickly test the cold start current, internal resistance, battery life and remaining power of a 12V start-up lead-acid battery to determine whether the battery needs to be replaced.
Basic function information:
Battery voltage detection.
Battery impedance detection.
How much battery is left when fully charged for a period of time (SOC).
This set of New UPA USB Programmer main unit used for main unit damaged
Software version: V1.3
EEproms: Simply connect the mainboard to the UPA programmer directly or by using a DB9 male / female extension cable (1:1). Insert the correct config key into the slot of the mainboard and start programming either via the ZIF or SOIC Socket. You can also use the included DIL to 10pin F-lat-ribbon header, put it inside the ZIF socket and wire up an SOIC clip or clamps for ISP use from there.
M-otorola MCUs: Pick the Adapter you want to use, attach the flat cable to the Adapter (PIN1 is always indicated, on both the cable and also the Adapter) and also to the 10pin ISP connector of main board. Select the VCC supply source by the jumper on the mainboard next to the ISP connector (on = target supplied from upa, off = target got own supply). Slide the Adapter over the soldered PLCC MCU on the target PCB. (No soldering, no pinout reviewing, no pin counting, saves lots of time and hassle and let you make your job faster, precise and easier)
Once your workshop is equipped with our Adapter Set you will have an all new UPA Experience.